DPR Projects
Completed
- Design Consultancy Badgaon Godana-Karahiya-Muhas-Lalpur-Pali Division- Katni (37.80km) Madhya Pradesh
- Detailed design f existing road to 2-lane Uttarakhand (Package-I) (30km) Client: NHIDCL
- Detailed design of Sumerpur Arch Steel Truss Bridge with a span of 121m (121mkm) Client: NHIDCL
Ongoing
- DETAILED PROJECT REPORT (DPR) AND FEASIBILITY STUDY (FS) OF ROAD SARLI-PHULLE-WASI-DHARMU-SANGIA (26.50km) ARUNACHAL PRADESH (Client: BRO)
- DETAILED PROJECT REPORT (DPR) AND FEASIBILITY STUDY (FS) OF ROAD TAPA KARU-SERING-BAGAN 85 RCC UNDER 756 BRTF PROJECT ARUNANK (68km) ARUNACHAL PRADESH (Client: BRO)
- DETAILED PROJECT REPORT (DPR) AND FEASIBILITY STUDY (FS) NACHO-BANGTE-NEYING (57km) ARUNACHAL PRADESH(Client: BRO)
- Detailed Design for Road Taliha-Nacho Project Arunank in Arunanchal Pradesh (Package-2) (21.954km) Client: BRO
- Detailed Design of Road Taliha-Nacho Project Arunank in Arunanchal Pradesh (Package-1) (23.40km) Client: BRO
- Feasibility Study (Fs) And Detailed Project Report (Dpr) On Epc ModeTapa-Hush-Dille. (Arunachal Pradesh) (58km)
Supervision Projects
Ongoing
- Supervision of Construction of 4 lane Gauripur Bypass NH-31 Dumardoha and Baladmara Assam under EPC (9.61 KMkm) Authoritys Engineer Client : MoRTH
- 4-Laning from End of Zuari approaches to Start of Margao Bypass NH-66 GOA (6.65km) Authority’s Engineer MoRTH
- 2 LANE WITH PAVED SHOULDER SRINAGAR–BARAMULA–URI NH-01 JAMMU & KASHMIR (43.760km) AUTHORITY’S ENGINEER Client: BRO